{"axis":"file_15162474","total":481,"total_source":"catalog","limit":20,"offset":0,"items":[{"record_key":"h:01c2e76bcb2ea7045e40610bb6701252","as_of":"2026-09-09","payload":{"국가":"아제르바이잔","무역관":"바쿠무역관","발굴일":"2025-03-17","공개여부":"Y","재원조달":"PPP","현장위치":"Baku","기간(시작)":"2025-04-01","기간(종료)":"2026-12-30","입찰예정일":"2025-09-22","프로젝트명":"ASWRA SOLAR POWER PLANT","무역관 의견":"This project is a private investment initiative. A feasibility study has been prepared and submitted to the Agency for its implementation. Additionally, an RFP (Request for Proposal) document has been developed for the selection of an investor.The establishment of a solar power plant is particularly necessary in today’s context, as the global energy landscape shifts toward cleaner and more renewable sources. Solar energy offers a sustainable alternative to fossil fuels, helping to reduce greenhouse gas emissions, lower energy costs over time, and enhance energy security. For our region, where solar potential is high, this project represents a critical step toward diversifying the energy mix and ensuring a resilient and environmentally responsible power supply.As the project enters the preparatory phase for investor selection, it is vital that we identify a partner who shares this vision and can bring both technical expertise and financial strength to realize the project's full potential. A successful outcome will not only contribute to the development of the renewable energy sector but also support broader national and international sustainability goals.","규모(백만불)":"0.9","해외발주처명":"AZERBAIJAN STATE WATER RESOURCES AGENCY","프로젝트 단계":"세부계획","프로젝트 일정":"2025-2026","프로젝트 소분류":"신재생(태양광)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00345","프로젝트 상세정보":"SOLAR POWER PLANT will feed electricity to a pump station located in Baku, Azerbaijan. The pump station consumes approximately 22,000,000 kWh per year. The available land area for the solar power plant is 45,000 m². This project is part of the effort to transition to sustainable energy sources and reduce operational electricity costs while contributing to Azerbaijan’s renewable energy targets.Initial work has already begun on the construction of a solar power plant with a capacity of 6 MWp and an annual electricity production of 9,286,613.4 kWh in the area of one of the 19 underground central water reservoirs located in Baku.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0361db9a4a02cd4eeb3cd2e70f52d433","as_of":"2026-09-09","payload":{"국가":"필리핀","무역관":"마닐라무역관","발굴일":"2025-02-06","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Aurora Pacific Ecozone and Freeport Authority (APECO)","기간(시작)":"2026-07-01","기간(종료)":"2027-11-19","입찰예정일":"2026-03-20","프로젝트명":"Lagoon Boardwalk / Esplanade","무역관 의견":"□ Notes on Business proposalTentative Bidding: First half of 2026Target Completion / Operation: Jul;y 2026 to 2027□ ImplicationsResearch on the project information and schedule.Reached out to APECO for project information□ Contact History Initial communication: November 20, 2024report: Sent email inquiry to Mr. Gene Angelo Ferrer of APECO to seek project information.Received initial feedback from APECO on November 22, 2024.Sent email reply to APECO on November 26, 2024Received project information details from APECO on February 06, 2025.","규모(백만불)":"0.077","해외발주처명":"AURORA PACIFIC ECONOMIC ZONE AND FREEPORT AUTHORITY (APECO)","프로젝트 단계":"세부계획","프로젝트 일정":"Project Update: - Feasibility Study:\t\t\tJuly to December 2025- Terms of Reference Approval:\tNovember to December 2025- Detailed Engineering and Design:\tNovember to December 2025- Start of Construction:\t\t\t\tJuly 2026- Target Project Completion/Implementation:\tJuly 2026 to 2027- Tentative Bidding: First half of 2026","프로젝트 소분류":"토목(도로)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00144","프로젝트 상세정보":"A project that involves the construction of a 2-kilometer boardwalk around a lagoon, featuring seating areas, viewing platforms, and eco-friendly materials to promote sustainable tourism and preserve the natural environment.The project requires durable, eco-friendly construction materials, landscaping expertise, and seating/viewing area installations.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:038c961ff143fbeaad2a852e476e0a11","as_of":"2026-09-09","payload":{"국가":"남아프리카공화국","무역관":"요하네스버그무역관","발굴일":"2025-05-05","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Nothern Cape, North West and Gauteng","기간(시작)":"2026-04-01","기간(종료)":"2030-03-29","입찰예정일":"2025-07-01","프로젝트명":"400kV Transmission Network (1,164km) Pilot Bidding Project","무역관 의견":"There is strong interest in this project from KEPCO. Who have the technology to support. If pricing and technology are on Par then participation in this project becomes more valuable","규모(백만불)":"500","해외발주처명":"IPP OFFICE","프로젝트 단계":"계획","프로젝트 일정":"- Project is in Pilot Phase- RFQ scheduled for July 2025- RFP scheduled for November 2025","프로젝트 소분류":"전력(송배전)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00421","프로젝트 상세정보":"This project is Pilot Phase.- RFQ to be released in July 2025- RFP to be released in November 2025- Project will adopt a Build-Operate-Transfer (BOT)- Private developers will design, finance, construct and operate the transmission infrastructure- Ownership to be transferred to the National Transmission Company South Africa","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0406caca7c6c41687a550bca659d56c1","as_of":"2026-09-09","payload":{"국가":"남아프리카공화국","무역관":"요하네스버그무역관","발굴일":"2025-02-12","공개여부":"Y","재원조달":"발주처 재원","현장위치":"North West","기간(시작)":"2025-06-30","기간(종료)":"2032-06-30","입찰예정일":"2025-06-30","프로젝트명":"NECSA Multipurpose Reactor Project","무역관 의견":"As long as the supplier has technical knowledge of the  way in which a reactor works and all the intricate details that goes with it.Nuenergy wants only experienced suppliers.","규모(백만불)":"1000","해외발주처명":"NUENERGY","프로젝트 단계":"계획","프로젝트 일정":"- First RFI released in 2017, but it canceled at the time. - New RFP date  set for end of 2nd Q-  Financial Closure to be reached by 4th Q- Duration of project is 7 construction years with the  with operational life of 60 years","프로젝트 소분류":"발전(원자력)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00179","프로젝트 상세정보":"- RFQ released end of 2nd q- Financial closure to be reached by 4th q- Construction  set to start 1st q 2026- NuEnergy bidding for the project","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:04b688371258ef6a13d1e6a5b4732fd9","as_of":"2026-09-09","payload":{"국가":"콜롬비아","무역관":"보고타무역관","발굴일":"2026-03-30","공개여부":"Y","재원조달":"PPP","현장위치":"Antioquia, Caldas","기간(시작)":"2027-01-01","기간(종료)":"2030-12-31","입찰예정일":"2026-06-30","프로젝트명":"Antioquia gorvenment's project (Tren del Rio)","무역관 의견":"Since this project is in its early characterizing phase, it offers a prime entry window for large-scale engineering, procurement, and construction (EPC) contractors and global infrastructure developers. Foreign enterprises can position themselves early by initiating joint ventures or consortiums to participate in upcoming design, structural mapping, and feasibility tenders.","규모(백만불)":"2.6","해외발주처명":"ACI MEDELLIN - AGENCY FOR COOPERATION AND INVESTME...","프로젝트 단계":"계획","프로젝트 일정":"There is no official schedule yet, but the Medell n Government has projected this to begin in early 2027 and finish by 2030. (LOI date : 2026-03-30)","프로젝트 소분류":"토목(철도)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2026-00190","프로젝트 상세정보":"The R o Train is an initiative aimed at connecting Barbosa with Caldas. It has a total length of 63 km, and its current status is feasible. The project is expected to operate 36 electric trains with 17 stations plus 8 stations integrated into the Medell n Metro. It will include 2.9 km of underground track and is designed to reach an average speed of 70 to 100 km per hour.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:04fb13d72d654fa411424846cb0d2bbc","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"하노이무역관","발굴일":"2025-12-13","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Bac Ninh Province, Vietnam","기간(시작)":"2025-01-01","기간(종료)":"2060-01-01","입찰예정일":"2027-01-01","프로젝트명":"Dong Nam New City","무역관 의견":"This huge project will be developed by 24 Korean enterprises, therefore this is a big chance for Korean companies to enter the tender.","규모(백만불)":"400","해외발주처명":"BAC NINH DEPARTMENT OF PLANNING AND INVESTMENT","프로젝트 단계":"F/S","프로젝트 일정":" \tJuly/2024:  Signed MOU between LH   Bac Ninh Province for cooperation in new city development \tNovember/2024: Signed MOU between LH   EWP, Posco E&C, Daewoo E&C…(24 Korean companies) to establish public-private advisory agency for the Dong Nam New City in Bac Ninh province, including establishing a cooperative system for power supply. \tQ1/2025: Preparation for F/S report \t2027: Bidding and construction","프로젝트 소분류":"도시(신도시)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00220","프로젝트 상세정보":"Background \tThe necessity of power supply plan and feasible study in accordance to the Dong Nam New Urban Development Plan \tIn addition, Bac Ninh is home to factories of large international corporations such as Samsung Group and Hanwha Group (South Korea), as well as Foxconn, a multinational electronics manufacturer based in Taiwan (China).Therefore, this presents an opportunity for Korean construction companies and corporations to expand their investment into housing development and infrastructure, rather than solely focusing on building industrial factories.Main information:The city will be developed based on the K-City model of South Korea with: \tProject site: 18 km northeast of Hanoi, around Que Vo Dist. (Bac Ninh) \tTotal area: ~1,500 ha \tPopulation: 65,000 ppl. \tFacility capacity: ~195 MW \tPower source: Solar power (100 MW)/ Biomass (40 MW)/ Waste to Energy (5 MW)내용 : 해당 프로젝트는 LH에서 추진하는 신도시 개발 사업. LH의 UGPP(도시개발협력프로그램) 서비스 일종으로 박닌성과 MOU 체결 후 동남성 신도시 전력/수도/인프라 등 복합 도시 개발 프로젝트로 추진 중에 있음","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:052ba5a2273bba81f9a61e95da2e68b1","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"다낭무역관","발굴일":"2025-06-06","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Da Nang","기간(시작)":"2025-06-06","기간(종료)":"2025-12-06","입찰예정일":"2025-09-01","프로젝트명":"Da Nang Cultural and Cinematic Center","무역관 의견":"- The project is funded by the City's budget, thus it is not likely to be open for international tendering. However, it can be a good opportunity for Korean architecture and construction companies operating in Vietnam and those who have Vietnamese partners. In fact, in 2016, a Korean architecture company (JINA Architect), in collaboration with Da Nang Construction Planning Institute, won the design proposal for Da Nang Children's Cultural Center construction project.- This project is regarded as one of the architectural features for the city, connecting with the International Exhibition Centre and Youth Park nearby to be a combination centre for major events held in the City. The architectural perspective is considered to be an important part for evaluation and the investor will organize a design competition for the architectural proposal. Da Nang City expects to attract high expertise companies to join the competition to optimize the chance to select a quality partner.","규모(백만불)":"20","해외발주처명":"DA NANG MANAGEMENT BOARD OF CIVIL AND INDUSTRIAL CONSTRUCTION WORKS PROJECTS","프로젝트 단계":"세부계획","프로젝트 일정":"6.2025: approval of investment policy6~12.2025: organizing project design proposal competition~7.2025: preparation for investment procedures2026-2028: implementation of project construction","프로젝트 소분류":"건축(빌딩)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00511","프로젝트 상세정보":"Location: Hoa Cuong Nam ward, Hai Chau District and Khue Trung ward, Cam Le District, Da Nang CityLand area: 49,000m2 (including 9,000m2 water surface)Construction overview:The Central Cinema and Cultural Center building consists of 4 above-ground floors, a semi-basement, and a rooftop structure, with a total construction floor area of approximately 19,758 square meters. The functional layout includes a multipurpose auditorium, exhibition rooms, movie theaters, club activity rooms, classrooms for arts and talent development, functional rooms, administrative and auxiliary rooms, lobbies, corridors, circulation areas, and other supporting facilities. The project also includes technical infrastructure, landscape greenery, a pedestrian overpass across the canal serving as a landscape highlight, and equipment installations.Objectives: The Da Nang City Cinema and Cultural Center is a venue for hosting large-scale cultural events such as the Asian Film Festival in Da Nang and film weeks serving political and diplomatic missions. It also serves as a location for training and professional development in fields such as cinema and theater, directing, screenwriting, cinematography, and film production.Project development period: 2025-2028Total investment capital: 520 billion VND (~20 million USD)Funding source: Da Nang City's budgetCurrent progress: preparation for investment","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:05808232527ea257b402bf6119ac3ae2","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"하노이무역관","발굴일":"2025-10-20","공개여부":"Y","재원조달":"PPP","현장위치":"Dak Lak Province, Vietnam","기간(시작)":"2026-01-01","기간(종료)":"2030-12-01","입찰예정일":"2026-09-01","프로젝트명":"Phu Mo Pumped Storage Hydropower","무역관 의견":"The project is looking for co-investor. Korean enterprises who have experience in this field can be investor which gives high chance for contractors to participate.","규모(백만불)":"220","해외발주처명":"MINH THACH D&L CONSTRUCTION JOINT STOCK COMPANY","프로젝트 단계":"계획","프로젝트 일정":" \tQ4/2025-Q1/2026:F/S report \tQ2/2026: Investment decision approval \tQ2-Q4/2026: Bidding \tQ1/2027: Construction commencement \t2029-2030: COD","프로젝트 소분류":"발전(수력)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00922","프로젝트 상세정보":"Project Background:Pumped Storage Hydropower (PSH) is currently still considered as a very priority source in the adjusted Power Plan VIII to balance the system with more renewable electricity (wind and solar power). Therefore, Vietnam targets ~10,000 MW of pumped storage hydropower by 2050.Main information: \tThe project supplies electricity to the National Power System. \tCapacity: 400 MW \tNumber Turbine: 4x100MW \tPumping Water Storage During Off-Peak Hours \tGenerating Electricity During Peak Hours of the Day \tEstimated Power Generation Capacity: 2,000MW/day; 730,000 MWh/year  \tTransmission line: 220kV \tElectricity price: 13.5 USD cents /kWh","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:081615aab9a7af27f78a99826f2998da","as_of":"2026-09-09","payload":{"국가":"아랍에미리트","무역관":"두바이무역관","발굴일":"2025-05-22","공개여부":"Y","재원조달":"PPP","현장위치":"Dubai","기간(시작)":"2026-06-15","기간(종료)":"2026-12-31","입찰예정일":"2026-01-15","프로젝트명":"Rental Marketplace Platform","무역관 의견":"This platform serves as a critical infrastructure to meet Dubai’s rapidly growing demand for smart mobility by integrating vehicle and equipment rental services into a unified digital marketplace. While the original RTA system was primarily regulation-focused, this project emphasizes enhanced user-centric features and greater private sector integration.For Korean companies, it represents an ideal opportunity to leverage their expertise in ICT, AI, platform operations, and mobility solutions to enter the market. The PPP model helps distribute initial investment risks while providing a stable revenue model and long-term operational rights.Furthermore, partnering with government entities like the RTA offers strategic advantages in brand credibility and access to the UAE market. As this project aligns with global trends in digital government, smart cities, and sustainable transportation, it also presents valuable prospects for technology export and reference building.","규모(백만불)":"1.36","해외발주처명":"RTA(ROADS&TRANSPORT AUTHORITY)","프로젝트 단계":"F/S","프로젝트 일정":"Main Contract Tender Issue (ITB, RFP): 1 Dec 2025Main Contract Commercial Bid Submission: 15 Jan 2026Main Contract Award: 15 Mar 2026Construction Start date: 15 Jun 2026Construction Completion: 31 Dec 2026Maintenance tenure: 31 Dec 2031 (5 years)","프로젝트 소분류":"디지털정부(기타)","프로젝트 중분류":"ICT융복합","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00544","프로젝트 상세정보":"Client: Dubai Road Transport Authority (RTA)Sector:  ICT > Digital Government > Etc  Contract Type: PPPStatus: F/SProject Overview: The Dubai Roads and Transport Authority (RTA) is initiating the Rental Marketplace Platform project an integrated digital ecosystem designed to consolidate all rental service providers on a single smart platform. The platform will offer a wide range of rental products, including cars, recreational vehicles, caravans, motorbikes, and equipment, under unified pricing models and quality standards.The project will be delivered under a Design, Build, Finance, Operate, and Transfer (DBFOT) model, with an estimated total capital expenditure of AED 5 million (approximately USD 1.36 million). The operational tenure is planned for 5 years, during which the private partner will be responsible for both platform management and service delivery, in alignment with RTA’s digital transformation goals.Originally launched in 2021 as a regulatory system (TARS), the platform lacked user-focused functionality and private sector integration. In response to growing demand, RTA relaunched the initiative in 2025 as a fully integrated digital marketplace with private sector participation.Key Smart Features Include: 1. Unified & Scalable MarketplaceA. A single digital platform covering all rental categories (cars, RVs, bikes, equipment, etc.)B. Modular design allows for future expansion and service integrationC. Ensures seamless access for both users and service providers2. Smart ContractingA. AI-driven contract generation and managementB. Real-time updates, renewal alerts, and expiration trackingC. Built-in compliance checks aligned with RTA regulations3. Full Ecosystem IntegrationA. API based integration with insurance providers, payment gateways, and service centersB. Linked to government platforms for license, registration, and inspection dataC. Enables end-to-end automation across the rental lifecycle4. Real-Time AnalyticsA. Live dashboards tracking usage trends and operational KPIsB. Predictive analytics for demand forecasting and fleet optimizationC. Supports data-driven decision-making for operators and authorities5. User Verification & ComplianceA. Biometric authenticationB. Automated vehicle registration and driver license validationC. Fraud detection and rule-based access controls6. AI Matching & Dynamic PricingA. Personalized rental suggestions based on user profile and locationB. Demand-based dynamic pricing that adapts to seasonality and trafficC. Optimizes utilization and revenue for providers","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:092151efa7a409e7ea3dc64f9254b400","as_of":"2026-09-09","payload":{"국가":"콜롬비아","무역관":"보고타무역관","발굴일":"2025-01-27","공개여부":"Y","재원조달":"PPP","현장위치":"톨리마 등","기간(시작)":"2026-05-01","기간(종료)":"2027-12-31","입찰예정일":"2026-02-02","프로젝트명":"콜롬비아 태양광 프로젝트 파이프라인","무역관 의견":"Viridi는 콜롬비아를 비롯한 중남미 사업 경험이 풍부하므로 중남미 진출을 희망하는 우리 기업은 협업을 검토할 만함투자사업으로 진행되므로 사업 참여를 위해서는 지분 투자 필요","규모(백만불)":"10","해외발주처명":"VIRIDI","프로젝트 단계":"F/S","프로젝트 일정":"3건의 프로젝트별 일정이 상이하지만 F/S 단계이며 2026년경 입찰 예상","프로젝트 소분류":"신재생(태양광)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00089","프로젝트 상세정보":"ㅇ 발 주 처  : Viridi  * 2006년 스페인의 Wurth Solar사의 자회사로 설립되어 유럽, 중남미 다양한 국가에서 재생에너지 프로젝트 개발, 운영 중ㅇ 프로젝트명: 콜롬비아 태양광 프로젝트(3건) 파이프 라인    ① Laguna 9.9MW, ②Minero 9,.9MW, ③Tolima Norte 50MW       * 세부 내용은 첨부 파일 참고 요망ㅇ 예산 재원 : 민간자본유치  ㅇ 발주시기  : ‘26년(잠정) ㅇ 입찰방식  : 공개입찰","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:093f15f6be8e89a3980ebf80d1ce8d8a","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"호치민무역관","발굴일":"2026-02-24","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Lien Chieu port area, Hoa Hiep Bac ward, Da Nang City","기간(시작)":"2027-01-01","기간(종료)":"2028-12-31","입찰예정일":"2026-07-01","프로젝트명":"Lien Chieu Port Area LNG Terminal Project","무역관 의견":"This is one of the important LNG infrastructure development projects in Da Nang City, which has been attracting the attention of both domestic and foreign investors (including the Korean investor) recently.","규모(백만불)":"207","해외발주처명":"DANANG PRIORITY","프로젝트 단계":"계획","프로젝트 일정":"* Project Schedule: 2027 - 2028* Stage of Project:-\tIn May 2025, Lien Chieu Port Area LNG Terminal Project were supplemented to the List of projects calling for investment in the period 2022-2026 (orientation to 2030) in Da Nang City;-\tAt present, Da Nang City is selecting the investor.","프로젝트 소분류":"산업(LNG설비)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2026-00080","프로젝트 상세정보":"1- Name of Project: Lien Chieu Port Area LNG Terminal Project2- Country: Vietnam3- Site Location: Lien Chieu port area, Hoa Hiep Bac ward, Da Nang City4- Project Outline:-\tTotal project area: approximately 62.29 hectares;-\tThe project aims to build 6 specialized berths for liquid/gas cargo. -\tIn the 2025-2030 period, 01 to 02 berths will be invested in to serve as storage facilities for liquefied natural gas (LNG) and liquefied petroleum gas (LPG), with a total berth length of 250 to 750 meters, capable of accommodating vessels up to 100,000 DWTs or larger if conditions permit;-\tThe project also includes investment in the construction of a liquid/gas storage system with components such as tank warehouses, factories, and supporting technical infrastructure in order to effectively serve the exploitation work.5- Total Project Cost: VND 5,429 billion (equivalent to USD 207 million)6- Source of Fund: 100% investor’s capital7- Project Owner: Da Nang City People’s Committee8- Project Schedule: 2027 - 20289- Stage of Project:-\tIn May 2025, Lien Chieu Port Area LNG Terminal Project were supplemented to the List of projects calling for investment in the period 2022-2026 (orientation to 2030) in Da Nang City;-\tAt present, Da Nang City is selecting the investor.10- Type of Bid - Bidder Selection Method: Open bidding in accordance with Vietnam’s bidding law.11- Bid Date: Q3-Q4/2026","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0999f89b92a7cfe3d791e34f89bf5c8d","as_of":"2026-09-09","payload":{"국가":"필리핀","무역관":"마닐라무역관","발굴일":"2025-02-06","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Aurora Pacific Ecozone and Freeport Authority (APECO)","기간(시작)":"2026-07-01","기간(종료)":"2029-11-23","입찰예정일":"2026-03-20","프로젝트명":"Ice Plant-Aurora Pacific Ecozone Authority (APECO)","무역관 의견":"□ Notes on Business proposalTentative Bidding: First half of 2026Target Completion / Operation: Jul;y 2026 to 2029□ ImplicationsResearch on the project information and schedule.Reached out to APECO for project information□ Contact History Initial communication: November 20, 2024report: Sent email inquiry to Mr. Gene Angelo Ferrer of APECO to seek project information.Received initial feedback from APECO on November 22, 2024.Sent email reply to APECO on November 26, 2024Received project information details from APECO on February 06, 2025.","규모(백만불)":"0.86","해외발주처명":"AURORA PACIFIC ECONOMIC ZONE AND FREEPORT AUTHORITY (APECO)","프로젝트 단계":"세부계획","프로젝트 일정":"Project Update: - Feasibility Study:\t\t\tJuly to December 2025- Terms of Reference Approval:\tNovember to December 2025- Detailed Engineering and Design:\tNovember to December 2025- Start of Construction:\t\t\t\tJuly 2026- Target Project Completion/Implementation:\tJuly 2026 to 2029- Tentative Bidding:  First half of 2026","프로젝트 소분류":"기타(기타)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00140","프로젝트 상세정보":"Project Update: - Feasibility Study:\t\t\tJuly to December 2025- Terms of Reference Approval:\tNovember to December 2025- Detailed Engineering and Design:\tNovember to December 2025- Start of Construction:\t\t\t\tJuly 2026- Target Project Completion/Implementation:\tJuly 2026 to 2029- Tentative Bidding:","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:09eabdf1b733b28af449b78e1d5415e6","as_of":"2026-09-09","payload":{"국가":"키르기즈스탄","무역관":"알마티무역관","발굴일":"2025-01-13","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Bishkek","기간(시작)":"2025-05-12","기간(종료)":"2025-12-31","입찰예정일":"2025-05-12","프로젝트명":"Urban Harvest - 지속가능한 농업을 위한 비슈케크 수경재배 타워 시스템","무역관 의견":"Urban Harvest 프로젝트는 키르기스스탄에서 수경재배 기술을 활용해 신선하고 고품질의 채소를 연중 생산하는 상업적으로 유망한 이니셔티브로 평가받고 있습니다. 이 프로젝트는 비슈케크의 낮은 채소 자급율에 대한 시장의 수요를 충족시키며, 자원 소비를 최소화하면서도 높은 생산성과 효율성을 위한 기술 도입을 목표로 합니다. 또하느 이는 국가 식량 안보를 위한 과제와도 부합하여 정부 보조금을 통한 프로젝트 안정성이 보장되어 더욱 매력적인 기회로 다가올 것 입니다.","규모(백만불)":"2","해외발주처명":"JASH EGIN LLC","프로젝트 단계":"세부계획","프로젝트 일정":"Phase 1: 계획 및 개발 (2024년 12월 ~ 2025년 3월) \t수경재배 타워 설치를 위한 적합한 도시 지역 선정. \t환경영향평가 및 수자원 사용 계획 포함한 타당성 조사 실시. \t글로벌 공급업체로부터 가장 효율적인 도시 농업용 수경재배 시스템 평가. \t기술 및 재무적 프레임워크를 중심으로 한 초기 비즈니스 플랜 개발.Phase 2: 실행 단계 (2025년 5월 ~ 2025년 6월) \t국내외 이해관계자를 포함한 잠재 투자자들에게 상세 비즈니스 플랜 제출. \t비슈케크 시청 및 국제 수경재배 기술 제공업체와 MOU 체결. \t투자자와 자금 조달 계약 체결 및 재무 조정 완료. \t정부 당국으로부터 필요한 허가 및 면허 취득. \t공급업체로부터 수경재배 타워 시스템 및 관련 장비 조달. \t선택된 설치 부지에 대한 시스템 레이아웃 설계 및 확정.Phase 3: 설치 및 교육 (2025년 7월 ~ 2025년 9월) \t안전 및 품질 기준을 준수하며 지정된 부지에 수경재배 타워 설치. \t현지 근로자 및 도시 농부를 대상으로 시스템 운영 및 유지보수 교육 프로그램 진행. \t자원 사용 및 생산성을 추적할 수 있는 모니터링 시스템 구축.Phase 4: 운영 개시 (2025년 10월 ~ 2025년 12월) \t수경재배 농업 운영 개시 및 첫 번째 수확 주기 시작. \t현지 시장 및 유통업체와의 협력을 통해 생산물 판매. \t성과 평가를 실시하고, 확장 가능성을 고려한 운영 방식 개선.","프로젝트 소분류":"스마트팜(농산)","프로젝트 중분류":"ICT융복합","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00015","프로젝트 상세정보":"프로젝트 개요 : 키르기스스탄 북부는 도시 농업 혁신의 잠재력이 풍부하지만, 지속 가능한 식량 생산이라는 과제에 직면해 있습니다. 급격한 도시화로 농업 공간이 감소하고 수입 농산물에 의존도가 높아져 외부 충격에 취약한 식량 시스템이 형성되었습니다. 이를 해결하려면 도시 내 제한된 공간에서 생산성을 극대화할 수 있는 수경재배와 같은 혁신적인 해결책이 필요합니다. 그래서 Jash Egin은 키르기스스탄에서 지속 가능한 농업을 위해 수경재배 솔루션을 선택하고, 동 프로젝트를 통해 스마트 수경재배 기술을 활용해 자원을 최적화하고 연중 지역 식량 생산을 보장함으로써 도시 농업을 혁신하는 것을 목표로 하고 있습니다2. 상황 및 문제 분석:비슈케크의 인구 증가로 신선하고 지속 가능한 식품에 대한 수요가 증가하고 있지만, 도시 내 경작 가능한 토지가 제한되어 있어 이를 충족하기 어렵습니다. 현대 농업 인프라 부족으로 인해 수입 채소 의존도가 높아지고, 이는 높은 비용과 신선도 저하로 이어집니다. 이 프로젝트는 수직 수경재배 시스템을 도입해 혁신적이고 친환경적인 도시 식량 생산 솔루션을 제공하는 것을 목표로 합니다. 이 시스템은 기존 농업 대비 90% 적은 물을 사용하며 최소한의 토지만 필요합니다. 이를 통해 식량 안보를 강화하고, 식품 운송으로 인한 탄소 배출을 줄이며, 현대 농업 분야의 고용 기회를 창출할 것입니다. 직원 교육과 국제 수경재배 기술 전문가와의 협력을 통해 높은 품질과 시스템 확장이 가능하도록 할 것입니다.3. 정책 및 제도적 맥락:이 프로젝트는 농업부와 비슈케크 지역 당국의 지원을 받고 있으며, 정부의 지속 가능한 개발 목표와 도시 계획 전략과 일치합니다. 경제부와 기술 및 환경 기관이 프로젝트의 환경 규제 준수와 자원 효율성을 감독할 예정입니다. 한국의 수경재배 기술 제공업체와의 협정을 통해 기술을 도입하고 농업 혁신을 이루고자 합니다.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0b7507b9c9c6236a19a4d56cbe97140d","as_of":"2026-09-09","payload":{"국가":"케냐","무역관":"나이로비무역관","발굴일":"2025-11-04","공개여부":"Y","재원조달":"기타","현장위치":"KONZA - Machakos","기간(시작)":"2027-01-01","기간(종료)":"2029-12-31","입찰예정일":"2026-02-02","프로젝트명":"ESTABLISHMENT OF SOLID WASTE RESOURCE RECOVERY FACILITY (SWRRF)","무역관 의견":"Selection will be based on demonstrated quality and reasonable price offering. All tender documents must be in English.","규모(백만불)":"259","해외발주처명":"KONZA TECHNOPOLIS DEVELOPMENT AUTHORITY, KOTDA","프로젝트 단계":"계획","프로젝트 일정":"The project is currently at the conceptualization stage, the feasibility study is scheduled for 2027 with support from the Government of Korea.","프로젝트 소분류":"환경(폐기물)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00895","프로젝트 상세정보":"TITLE: ESTABLISHMENT OF SOLID WASTE RESOURCE RECOVERY FACILITY (SWRRF)The Integrated Solid Waste Resource Recovery Facility (SWRRF) project aims to promote sustainable industrialization and circular economy practices within Konza Technopolis by converting waste into valuable resources and fostering green innovation. The project will involve comprehensive feasibility studies, environmental assessments, and detailed design development leading to the establishment of a modern facility for waste recycling, energy generation, composting, and e-waste management. A dedicated Research and Development Hub will advance innovations in waste utilization and green technologies. The project contributes to Kenya’s environment and climate change agenda, aligning with Vision 2030 and the Sustainable Development Goals (SDGs) on clean energy, sustainable cities, and responsible consumption.PROJECT SCOPE  \tConduct a feasibility study and prepare an Integrated Solid Waste Management Masterplan for Konza Technopolis. \tUndertake an Environmental and Social Impact Assessment (ESIA) to ensure environmental compliance and sustainability. \tDevelop detailed architectural and engineering designs for the Solid Waste Resource Recovery Facility. \tEstablish a comprehensive waste management complex, including:o\tWaste-to-Energy Conversion Planto\tWaste Recycling and Material Recovery Facilityo\tSolid Waste Collection and Segregation Facilityo\tOrganic Waste Composting Planto\tAnaerobic Digestion (Biogas) Planto\tE-Waste Management Facility \tCreate a Waste Management Research and Development Hub to promote innovation in circular economy and green technologies. \tAttain Green Certification for the facility to ensure adherence to global environmental standards.PROJECT SCHEDULE The project is currently at the conceptualization stage, the feasibility study is scheduled for 2027 with support from the Government of Korea. The estimated cost is Kshs. 33.4 billion ($259 Million). The estimated cost breakdown is as below: Project activity \tProject size (USD Million)Feasibility study report and an Integrated Solid Waste Management Masterplan report\t0.5Environmental and Social Impact Assessment (ESIA) Report.\t0.2Development of Project Detailed Designs\t0.5Establishment of an integrated Solid Waste Resource Recovery Facility (SWRRF) (waste to energy conversion plant, Waste Recycling and Material recovery Facility, Solid waste collection and segregation Facility, Organic Waste Treatment (Composting) plant,Anaerobic digestion plant (Biogas) and E-waste management facility)\t255.6Waste Management Research and Development Hub.\t2Green Certificate for the Solid Waste Resource Recovery Facility.\t0.2Sub-Total\t259Method of procurement will be Public Procurement (Open national and international tendering).","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0c2dc30b69fe88255df2e0bcb5cbbc8d","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"하노이무역관","발굴일":"2025-02-24","공개여부":"Y","재원조달":"기타","현장위치":"Ho Chi Minh City","기간(시작)":"2024-01-01","기간(종료)":"2028-12-31","입찰예정일":"2026-03-01","프로젝트명":"Expansion of National Highway 13, section from Binh Trieu bridge to Binh Duong province","무역관 의견":"This is a vital traffic routes that are given priority for investment according to special mechanisms. Therefore, with modern technology and expertise, it would be an advantage for foreign partner like Korean to participate the high priority project like this.","규모(백만불)":"819.28","해외발주처명":"HO CHI MINH CITY DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKDS","프로젝트 단계":"F/S","프로젝트 일정":"  2024: Planning  Q1-Q3/2025: F/S report and final approval  Q3/2025-Q3/2026: Land clearance and resettlement  Q3/2026 - 2028: Construction   Q4/2028: Operation","프로젝트 소분류":"토목(도로)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00246","프로젝트 상세정보":"Project objective:National Highway 13 is a vital transport corridor linking Ho Chi Minh City to Binh Duong, Binh Phuoc, and the Central Highlands. After the upgrade, the highway will serve as a fast, uninterrupted transport route.Main Information:- Total land use for the project: about 39.54ha- The project is divided into 2 component project groups:+ Component project 1: Compensation, support, resettlement in Thu Duc City will be implemented with the city budget capital. (CP1)+ Component project 2: Investment in construction of upgrading and expanding National Highway 13 which implemented under BOT contract - PPP method. (CP2)- Total investment: US$ 819.28 million, including:+ Compensation, resettlement (CP1): US$573 million + Construction (CP2): US$246.28 million - The BOT model will allow investors to collect tolls for 21 years and 4 months to recover costs.Tentative project timeline:  2024: Planning  Q1-Q3/2025: F/S report and final approval  Q3/2025-Q3/2026: Land clearance and resettlement  Q3/2026 - 2028: Construction   Q4/2028: Operation","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0ca696f904bd07329c944e7fcd2caf0f","as_of":"2026-09-09","payload":{"국가":"브라질","무역관":"상파울루무역관","발굴일":"2025-06-11","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Paran  State","기간(시작)":"2025-11-16","기간(종료)":"2025-12-16","입찰예정일":"2025-11-15","프로젝트명":"Strategic Expansion in Sanitation Concessions / Paran  State","무역관 의견":"KOTRA believes that Korean companies renowned for their technological excellence in infrastructure and sanitation should form consortia to jointly participate in bidding processes in Brazil.","규모(백만불)":"55,000","해외발주처명":"COMPANHIA DE SANEAMENTO DO PARAN ","프로젝트 단계":"계획","프로젝트 일정":"사업자 선정방식 (Contractor Selection Method): Public Tender입찰예정일 (Expected Bidding Date): Q4 2025재원조달 (Funding Source): Public funds, state government investment다음단계 (Next Steps):Tender process and contractor selectionDetailed executive project developmentStart of land expropriation and preparatory worksCivil construction initiation in 2026","프로젝트 소분류":"환경(폐수처리장)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00584","프로젝트 상세정보":"Project Name: Strategic Expansion in Sanitation Concessions in BrazilThe Companhia de Saneamento do Paran    SANEPAR presents below a strategic project aligned with the expansion opportunities in the Brazilian sanitation concessions market. The objective is to expand its operations into new territories and identify strategic partnerships with Korean companies.The project is based on established trends and the Company’s solid experience in operating water supply and sewage systems, taking advantage of a favorable regulatory environment and the significant volume of investments planned for the coming years.프로젝트 분야 (Project field): Water Treatment / Environment 프로젝트 규모 (Estimated Cost):Long-term: Total investment estimated for universalization of sanitation in Brazil by 2033: R$ 310 billion (  US$ 55 billion). And in the short-term (1 3 years): R$ 75 billion (  US$ 13 billion)용량 (Capacity):At least 20 concessions in the short term, with potential to expand and serve around 50% of Brazilian municipalities, benefiting over 100 million inhabitants.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0d17d0442812f275d10a9b2292c9b3a2","as_of":"2026-09-09","payload":{"국가":"아르메니아","무역관":"모스크바무역관","발굴일":"2025-02-24","공개여부":"Y","재원조달":"MDB","현장위치":"Sisian-Kajaran","기간(시작)":"2025-10-01","기간(종료)":"2027-12-31","입찰예정일":"2025-07-15","프로젝트명":"아르메니아 남북 회랑(Sisian-Kajaran) 도로건설 사업","무역관 의견":"ㅇ 재원, 실제 시행 가능성 등 고려시, 아르메니아내 최대 유망 프로젝트","규모(백만불)":"1479","해외발주처명":"ARMENIA ROAD DEPARTMENT","프로젝트 단계":"PQ","프로젝트 일정":"ㅇ 2024년말 : 세부 시행 계획 수립 완료ㅇ 감리, 설계, 시공사 선정은 2025년 하반기내 이뤄질것으로 전망  * 입찰 공고는 아르메니아 도로청을 통해 공고 예상","프로젝트 소분류":"토목(도로)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00327","프로젝트 상세정보":"최근 EBRD에서 승인한 프로젝트로 아르메니아 Sisian-Kajaran간 60km에 달하는 도로건설 사업 - 총 공사비용은 13.5억 유로(EBRD는 이중 2.36억 유로 규모를 대출 지원)로 알려짐","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0f11c76b229b98b6149f85342517017a","as_of":"2026-09-09","payload":{"국가":"중국","무역관":"시안무역관","발굴일":"2025-06-20","공개여부":"Y","재원조달":"발주처 재원","현장위치":"산시성 옌안(延安)시 쯔창(子 )시","기간(시작)":"2026-02-02","기간(종료)":"2028-02-02","입찰예정일":"2026-01-05","프로젝트명":"산시성 옌안(延安)시 쯔창(子 )시 석탄폐석 종합 이용 산업단지 건설 프로젝트","무역관 의견":"해당 프로젝트는 중국 섬서성 옌안시 현지 자원(석탄)과 경제산업이 결합된 프로젝트로 현지에서 석탄 발굴시 배출된 폐기물을 이용하여 \"종합 산업단지\" 구축하는 것으로 공장 구축, 설비 구매, 기술협력 등 다방면에서 우리 기업의 참여 기회가 있음.","규모(백만불)":"890","해외발주처명":"INVESTMENT COOPERATION BUREAU, ZICHANG CITY, YAN'A...","프로젝트 단계":"계획","프로젝트 일정":"-현재 단계: 프로젝트 계획-입찰예정일: 2026-01-05","프로젝트 소분류":"산업(산업단지)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00566","프로젝트 상세정보":"ㅇ 동 프로젝트는 현지 정부(산시성 옌안시 쯔창시)에서 추진하는 프로젝트임. 프로젝트 위치는 산시성 옌안시(延安市) 소속의 쯔창시임. 전체 프로젝트 단지의 건설 부지는 1450묘( , 약 9570만m2) 이며 프로젝트 기간은 약 2.5년으로 계획됨. ㅇ 프로젝트 배경: 산시성 쯔창시는 천연자원이 풍부하며 도시 교통이 편리함. 특히 석탄의 지질학적 매장량이 28.94억 톤으로 현재 석탄폐석 보존량이 2000만톤 이상, 연간 석탄폐석 생성량이 500-600만 톤임.  ㅇ 구체적 프로젝트 내용: 해당 프로젝트는 석탄폐석, 슬러지 등 석탄　채굴　시　배출된　고체폐기물을 원재료로 2*35만 KW급 초임계 열병합발전기 공장, 쯔창시 석탄폐석 자원 종합이용 공장(석탄폐석을 원재료로 건축자재 생산공장) 해당 산업단지에서 건설함.  2*35만 KW급 초임계 열병합발전기 공장 완공 후 연간 생산액이 역 2.85억 달러, 세금 2천800만 달러, 취업자 500명 달성 예정임.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:0f3b8b1ee8df767b0f74948c6de56da7","as_of":"2026-09-09","payload":{"국가":"필리핀","무역관":"마닐라무역관","발굴일":"2025-02-06","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Aurora Pacific Ecozone and Freeport Authority","기간(시작)":"2026-07-01","기간(종료)":"2028-12-29","입찰예정일":"2026-03-18","프로젝트명":"Business Cneter-Aurora Pacific Ecozone and Freeport Authority","무역관 의견":"A project that involves a facility offering office spaces, meeting rooms, and conference halls to support local and international businesses within APECO. INcludes modern, flexible layouts to faster collaboration and entrepreneurship.The project requires advanced office infrastructure, meeting facilities, and technology-driven solutions for productivity.Project Name: Business CenterSize: USD 2.5 Million (PHP 150 MIllion)Project Update: - Feasibility Study:\t\t\tJuly to December 2025- Terms of Reference Approval:\tNovember to December 2025- Detailed Engineering and Design:\tNovember to December 2025- Start of Construction:\t\t\t\tJuly 2026- Target Project Completion/Implementation:\tJuly 2026 to 2028","규모(백만불)":"2.5","해외발주처명":"AURORA PACIFIC ECONOMIC ZONE AND FREEPORT AUTHORITY (APECO)","프로젝트 단계":"세부계획","프로젝트 일정":"Project Schedule:- Feasibility Study:\t\t\t                  July to December 2025- Terms of Reference Approval:\t      November to December 2025- Detailed Engineering and Design:\tNovember to December 2025- Tentative Bidding Schedule                First half of July 2026 (March 18, 2026)- Start of Construction:\t\t\t\tJuly 2026- Target Project Completion/Implementation:\tJuly 2026 to 2028","프로젝트 소분류":"건축(빌딩)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00127","프로젝트 상세정보":"Description: A project that involves a facility offering office spaces, meeting rooms, and conference halls to support local and international businesses within APECO. Includes modern, flexible layouts to faster collaboration and entrepreneurship.The project requires advanced office infrastructure, meeting facilities, and technology-driven solutions for productivity.","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"},{"record_key":"h:1058d170cbcd6a391f2d27f1362084f8","as_of":"2026-09-09","payload":{"국가":"베트남","무역관":"호치민무역관","발굴일":"2025-06-30","공개여부":"Y","재원조달":"발주처 재원","현장위치":"Vinh Son hamlet, Phu Trach commune, Quang Tri province","기간(시작)":"2025-01-01","기간(종료)":"2030-12-31","입찰예정일":"2025-12-01","프로젝트명":"Quang Trach II LNG Thermal Power Plant Project","무역관 의견":"This is one of Vietnam's large-scale important projects in the field of power generation, which have been implementing in the 2025-2030 period according to the Vietnam's National Electricity Development Planning for the 2021-2030 period with a vision to 2050 (PDP8). There would be opportunities for Korean contractors to participate in the EPC Bid Package.","규모(백만불)":"1992.25","해외발주처명":"EVN","프로젝트 단계":"세부계획","프로젝트 일정":"* Project Schedule: 2024   2030- Put Plant Unit 1 into operation by Q4/2028; Plant Unit 2 by Q1/2029;- Completion of entire project by 2030* Stage of Project:- The investment policy (Pre-FS Report) of Quang Trach II LNG Thermal Power Plant Project was approved by the Prime Minister in 2021 and then adjusted in September 2024;- FS Report, Professional Reports and EIR Report are under implementation by a Vietnamese JV of consultants, PECC1 & PECC3;- At present, EVNPMB2 has been selecting a Vietnamese consultant for Bidding support and Contract Management for Design, Supply of Technology Equipment and Construction of Quang Trach II LNG Thermal Power Plant.","프로젝트 소분류":"발전(화력발전)","프로젝트 중분류":"건설플랜트","발굴실적 인정여부":"인정","프로젝트 관리번호":"2025-00636","프로젝트 상세정보":"1- Name of Project: Quang Trach II LNG Thermal Power Plant Project2- Country: Vietnam3- Site Location: Vinh Son hamlet, Phu Trach commune, Quang Tri province4- Project Outline: Investing in the construction of Quang Trach II LNG thermal power plant with a capacity of 1,500 MW.   Project objective: Providing electricity to the national power system, contributing to ensuring safe power supply to the system, meeting the requirements of the VIII power plan, in order to minimize emissions of toxic substances, contributing to protecting the ecological environment;  The Quang Trach II LNG Thermal Power Plant Project was approved by the Board of Members of EVN to divide the Project into 02 component projects: (a) Component project 1   Power plant:- Objective: Invest in the construction of a power plant with a capacity of about 1,500 MW including combined cycle gas turbine generators, auxiliary systems of the generators such as water supply and treatment systems, wastewater treatment, electrical systems, synchronous measurement and control;- Scale: Designed capacity of about 1,500 MW, including 02 units and auxiliary systems, each unit has an installed capacity of about 750MW, using combined cycle gas turbines with the expected configuration according to the basic plan 1-1-1 single shaft (1 Gas Turbine + 1 Heat Recovery Furnace + 1 Steam Turbine, Gas Turbine & Steam Turbine share 1 generator), Plan 2-2-1 (2 Gas Turbines + 2 Heat Recovery Furnaces + 1 Steam Turbine, Gas Turbine & Steam Turbine use separate generator) and Plan 1-1-1 multi-shaft (1 Gas Turbine + 1 Heat Recovery Furnace + 1 Steam Turbine and Gas Turbine & Steam Turbine use separate generator) will be opened in the following stages;- Total investment of Component Project 1 (the equity ratio of about 20% / loan capital of 80%): VND 40,194,745 billion, equivalent to USD 1,539,143,987 (exchange rate of VIETCOMBANK on April 15, 2025: USD 1.00 = VND 26,115)- Implementation progress: 2024   2030 (Plant unit 1 will generate in 2028, Plant unit 2 in 2029. The project will be completed in 2030).(b) Component project 2 - LNG warehouse and port- Objective: Investing in the area of receiving, storing and re-gasifying LNG including the following items: Port to receive LNG ships up to 100,000 DWT; Bridge leading to the port; LNG tank with a volume of about 250,000 m3; Gas processing control house; Auxiliary systems, auxiliary equipment, pumps, pumping stations for re-gasification; Emergency diesel generator station; Gas generator; dredging to expand the shipping channel and turning basin for LNG ships; and some other items;- Scale: Scale of LNG storage and onshore regasification system with a designed capacity of about 1.5 million tons of LNG/year and a specialized port to import LNG for the power plant with a designed ship capacity of 100,000 DWT, LNG storage with a capacity of about 250,000 m3 and auxiliary systems;- Estimated total investment value of Component Project 2: VND 11,833.064 billion, equivalent to USD 453,113,694 (Note: exchange rate of VIETCOMBANK on April 15, 2025: USD 1.00 = VND 26,115);- Implementation progress: 2024   2030 (synchronized with the implementation progress and completion of Component Project 1 - Power Plant.5- Preliminary Total Project Cost: VND 52,490,804,287,428.00 (equivalent to USD 1,992.25 million)6- Source of Fund: EVN’s own capital (20%) and loan capital (80%)7- Project Owner: Vietnam Electricity (EVN) / Project management agency: Vietnam Electricity Power Projects Management Board No.2 (EVNPMB2)8- Project Schedule: 2024   2030- Put Plant Unit 1 into operation by Q4/2028; Plant Unit 2 by Q1/2029;- Completion of entire project by 20309- Stage of Project:- The investment policy (Pre-FS Report) of Quang Trach II LNG Thermal Power Plant Project was approved by the Prime Minister in 2021 and then adjusted in September 2024;- FS Report, Professional Reports and EIR Report are under implementation by a Vietnamese JV of consultants, PECC1 & PECC3;- At present, EVNPMB2 has been selecting a Vietnamese consultant for Bidding support and Contract Management for Design, Supply of Technology Equipment and Construction of Quang Trach II LNG Thermal Power Plant.10- Type of Bid - Bidder Selection Method (for EPC Package): International open bidding in accordance with Vietnamese Bidding Law;11- Bid Date for EPC Package: End of 2025 or early 2026","해외시장뉴스 공개여부":"Y"},"last_seen":"2026-09-18 05:30:52.969914+09"}]}